TodaySynced
Annual boiler service#4856 · Boiler service · 13:30

Before you go

Anita Patel: gas boiler service due.Ideal Vogue Max C32, fitted 2022 (4 years old). Last serviced 12 months ago.On a plan: boiler cover plan.

Where

Anita Patel 5 Kings Road, Prestwich, M25 0LEEquipment: Ideal Vogue Max C32

Risk assessment · Gas work

Tap whether each one is here today. The controls are what you do about it.
Gas escapeTightness test before and after the work. No smoking or naked flames. If you smell gas, make safe and follow the Gas Industry Unsafe Situations Procedure
Carbon monoxide from flues and appliancesCarry a CO monitor. Flue and combustion checks on every appliance you work on
Hot pipes, water and surfacesLet the system cool, drain down where needed, gloves for hot parts
Lofts, cupboards and tight spacesBoards and a light in lofts. Check the space is safe to work in before you start
Electrics on the applianceIsolate the appliance and prove dead before taking covers off
Method and PPE
  1. Arrive, introduce yourself and find the meter and the appliance
  2. Tightness test before starting
  3. Isolate gas and electrics to the appliance
  4. Carry out the work to the manufacturer's instructions and the Gas Safety Regulations
  5. Tightness test, flue and combustion checks after the work
  6. Show the customer, leave the paperwork and hand back
PPE: Safety boots, Gloves, CO monitor
Answer every hazard above, then sign here.

Boiler service checklist · 0 of 6

Customer signature

Available once you've arrived

Faults found · 0

Each one goes on the repair quote with its photo.

Stuck?

Ask about this equipment, a fault code or the manual. Answers come from your firm's own manuals and records, with where it found them.Ask

Worth mentioning

From the kit on record and your price book. Only if it feels right.
Gas boiler is due again in 5 daysOffer to book the next one now, so they don't have to ring.

Chat with the office

No messages yet. Type @ and a name to tell someone.

Leave a handover note

Extra work

You can agree up to £150 with the customer. Over that, the office approves it first.

Need a hand?

Show the office or the customer what you can see. Send them the link and they join from their phone or computer.

Another certificate for this job

Electrical installation condition reportEICR ›PAT test certificate and registerPAT ›Minor electrical installation works certificateMinor works ›Electrical installation certificateEIC ›Electrical danger notificationDanger notice ›Emergency lighting inspection and test certificate (BS 5266-1)Emergency lighting ›Fire alarm inspection and servicing certificate (BS 5839-1)Fire ›Fire alarm installation and commissioning certificate (BS 5839-1)Fire commissioning ›Fire extinguisher service certificate (BS 5306-3)Extinguishers ›EV charger installation certificateEV charger ›

Service record

Sent to the customer when you finish the job.