JobSaved
EICLandlord gas safety · 12 Elm Road, M21 9AB

Client and installation

Design, construction, inspection and testing

Supply characteristics and earthing

Particulars of the installation

Schedule of inspections

1.0 Condition of consumer's intake equipment
2.0 Parallel or switched alternative sources of supply
3.0 Automatic disconnection of supply: earthing and bonding arrangements
4.0 Other methods of protection
5.0 Distribution equipment: consumer units and boards
6.0 Distribution circuits
7.0 Final circuits
8.0 Isolation and switching
9.0 Current-using equipment (permanently connected)
10.0 Location(s) containing a bath or shower
11.0 Other special installations or locations
12.0 Prosumer's low voltage installation (solar, batteries)

Test results · DB1

Circuit 1 Tap to fill in

Declaration

I/We, being the person(s) responsible for the design, construction, inspection and testing of the electrical installation (as indicated below), particulars of which are described above, having exercised reasonable skill and care when carrying out the design, construction, inspection and testing, hereby certify that the said work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with BS 7671, amended to the date shown, except for the departures, if any, detailed above.

Check before it goes

Looks for blank boxes and readings that don't look right. Fix them, or tap It's right.