TodaySynced
EICR, 3-phase board#4870 · Electrical inspection (EICR) · 09:00

Before you go

Whitworth Mill: 14-year-old Schneider.Last visit 16 Nov: tripping circuit, 2nd floor, Sam.Schneider 3-phase distribution board, fitted 2012 (14 years old). Last inspected 59 months ago.Older than most. If it's costing them in repairs, offer a replacement quote. There's a button on the job.They owe £2,210. Don't bring it up, the office is chasing it.

Where

Whitworth Mill Whitworth Street, City Centre, M1 3HBAccess: Loading bay, buzz facilitiesEquipment: Schneider 3-phase distribution board

Risk assessment · Electrical work *

Sign this before you start. Tap whether each one is here today. The controls are what you do about it.
Electric shock from live partsSafe isolation: isolate, lock off, prove dead with a proved tester. Only work live if there is no other way, and never alone
Working at height (ladders, steps)Ladder checked before use, on firm ground, three points of contact. Use a tower or podium for longer work
Asbestos in old boards, ceilings or flash guardsAsk for the asbestos register in buildings built before 2000. Stop and report anything suspect
Dust and debris from drilling or chasingDust mask and eye protection. Cover furniture and floors. Hoover as you go
Customers, staff or the public near the workTell people before power goes off. Keep the work area clear and never leave a board open
Lifting and carrying kitLift with your legs, ask for help with anything heavy or awkward
Method and PPE
  1. Arrive, introduce yourself and agree with the person in charge what you are doing and when the power goes off
  2. Check the area: access, asbestos register, anything unsafe
  3. Isolate, lock off and prove dead before touching anything
  4. Carry out the work to BS 7671
  5. Test before putting the power back on, and record the results
  6. Tidy up, show the customer what was done and hand back
PPE: Safety boots, Insulated gloves, Eye protection, Dust mask when drilling
Answer every hazard above, then sign here.

Electrical inspection checklist · 3 of 6

Customer signature

Sign with a finger

Faults found · 2

Each one goes on the repair quote with its photo.
C2Board DB2, 2nd floorNo RCD on 6 office socket circuits
C3Main boardNo surge protection

Stuck?

Ask about this equipment, a fault code or the manual. Answers come from your firm's own manuals and records, with where it found them.Ask

Worth mentioning

From the kit on record and your price book. Only if it feels right.
Consumer unit is due again in 45 daysOffer to book the next one now, so they don't have to ring.

Job report

Written by AI from this job's records. Read it, change anything, then approve.

Working alone

Next check-in by 23:01.

Chat with the office

No messages yet. Type @ and a name to tell someone.

Leave a handover note

Extra work

You can agree up to £150 with the customer. Over that, the office approves it first.

Need a hand?

Show the office or the customer what you can see. Send them the link and they join from their phone or computer.
CertificateFill in the EICRSupply, particulars, inspections, test results per circuit, observations and summary. Saves as you go, even with no signal.

Another certificate for this job

PAT test certificate and registerPAT ›Minor electrical installation works certificateMinor works ›Electrical installation certificateEIC ›Electrical danger notificationDanger notice ›Emergency lighting inspection and test certificate (BS 5266-1)Emergency lighting ›Fire alarm inspection and servicing certificate (BS 5839-1)Fire ›Fire alarm installation and commissioning certificate (BS 5839-1)Fire commissioning ›Fire extinguisher service certificate (BS 5306-3)Extinguishers ›EV charger installation certificateEV charger ›

Electrical installation condition report

Sent to the customer when you finish the job.