JobSaved
EICRQuote visit · Oakfield Primary, M20 6RLWho it's for and why
The installation
Extent and limitations
Supply characteristics and earthing
Particulars of the installation
Schedule of inspections
1.1 Service cable, cut-out and meter tails in good condition
1.2 Distributor's earthing arrangement present and connected
3.1 Main earthing and bonding conductors present, sized and connected
4.1 Consumer unit adequate, secure and correctly labelled
4.2 Protective devices suitable and correctly rated
4.3 RCD protection where required (sockets, bathrooms, cables in walls)
4.4 Surge protection considered
5.1 Cables and wiring systems in good condition and supported
5.2 Cables concealed in walls protected or in safe zones
5.3 Fire barriers and sealing where cables pass through
6.1 Bathrooms and special locations meet requirements
7.1 Accessories, sockets and switches in good condition
7.2 Isolation and switching adequate
8.1 Labels and warning notices present
Test results · DB1
Circuit 1 Tap to fill in
Observations
None recorded. Faults you log on the job (C1, C2, C3, FI) appear here.