JobSaved
EICRBoiler service · Kingsway Dental, M19 2LP

Who it's for and why

The installation

Extent and limitations

Supply characteristics and earthing

Particulars of the installation

Schedule of inspections

1.1 Service cable, cut-out and meter tails in good condition
1.2 Distributor's earthing arrangement present and connected
3.1 Main earthing and bonding conductors present, sized and connected
4.1 Consumer unit adequate, secure and correctly labelled
4.2 Protective devices suitable and correctly rated
4.3 RCD protection where required (sockets, bathrooms, cables in walls)
4.4 Surge protection considered
5.1 Cables and wiring systems in good condition and supported
5.2 Cables concealed in walls protected or in safe zones
5.3 Fire barriers and sealing where cables pass through
6.1 Bathrooms and special locations meet requirements
7.1 Accessories, sockets and switches in good condition
7.2 Isolation and switching adequate
8.1 Labels and warning notices present

Test results · DB1

Circuit 1 Tap to fill in

Observations

Defect Water heater, staff roomFlue seal perished
NCS Water heater, staff roomNo ventilation label on the cupboard door

Summary and declaration

Check before it goes

Looks for blank boxes and readings that don't look right. Fix them, or tap It's right.