What you need to know
From Northside Heating & Electrical's own checklist.Arrived (must be done)
Safe isolation done (must be done)
Photo of the consumer unit (must be done): a photo
Circuits tested (must be done): a reading or number
Faults logged (C1, C2, C3, FI): a written note. Each one goes on the repair quote with its photo
Customer signature (must be done): a signature
1. Which of these is a step on the electrical inspection checklist?
2. Which of these is a step on the electrical inspection checklist?
3. What does "Photo of the consumer unit" need from you?
4. What does "Arrived" need from you?
5. How many steps on the electrical inspection checklist must be done before you can finish?