What you need to know
From Northside Heating & Electrical's own checklist.Signed in on site (must be done)
Last year's register loaded (must be done). Every item from the last test, so nothing gets missed
Items tested (must be done): a reading or number
Pass or fail label on every item (must be done)
Failed items taken out of use (must be done)
Site contact signature (must be done): a signature
1. Which of these is a step on the pat testing checklist?
2. Which of these is a step on the pat testing checklist?
3. Which of these is a step on the pat testing checklist?
4. What does "Failed items taken out of use" need from you?
5. What does "Items tested" need from you?