Jobs
New job
Jobs / #4828

5-year electrical inspection

#4828 · Electrical inspection (EICR) · Kingsway Dental · came in by email on 14 Nov at 09:00

On site
Pass to another firm
✓Logged✓Booked✓On the way4On site5Job done6Invoiced

Change who or when

Checklist · Electrical inspection

2 of 6 done
Arrived
tick
Safe isolation done
tick
Photo of the consumer unit
photoRequired
Circuits tested
numberRequired
Faults logged (C1, C2, C3, FI)Each one goes on the repair quote with its photo
text
Customer signature
signatureRequired

Risk assessment · Electrical work

Must be signed before starting
6 hazards to check. The engineer fills it in and signs on the phone before they can start.

Electrical installation condition report

Filled in on site

Forms

Site safety checkNot filled in
Customer handoverNot filled in
Thermal imaging surveyNot filled in

Tasks

0 to do

Chat

Only your team sees this
No messages yet. The engineer on this job sees them on their phone.

Handover notes

For whoever goes next

Job report and invoice line

Draft, to approve
Written by AI from this job's records. Read it, change anything, then approve.

Everything that's happened

ArrivedTom Hughes · 17 Nov 10:03

Live profit

-£592 · -247%
Price
£240
Parts and materials
£730
Labour
£102

Under your 20% alert line. Check the parts and time before more goes on it.

Extra work

Engineers can agree up to £150 on site
V-006: Customer wants the rest of the job done today while we're here: consumer unit changeTom Hughes · costs £730
£1,140Needs the office
Log extra work or a daywork

Project and subcontractor

Summary

Job #4828: Electrical inspection (EICR), 5-year electrical inspection. Status On site. Priority normal. For Kingsway Dental at 220 Kingsway, Burnage, M19 2LP. Tom Hughes is on it. Booked 17 Nov. Checklist 2 of 6 done.Example business: from the sample records.

Did it make money? (so far)

£121 · 50%
Billed
£240
Labour
£71 · 2h 5m of 3h booked
Travel
£36 · 45 min
Parts
£12

45 min travel each way

Before you go

What the engineer sees
Kingsway Dental: 10-year-old Hager.
Last visit 16 Nov: water heater service, Jake.
Hager 18-way RCBO board, fitted 2016 (10 years old). Last inspected 57 months ago.
Older than most. If it's costing them in repairs, offer a replacement quote. There's a button on the job.
Access: Park at the rear.
They owe £312. Don't bring it up, the office is chasing it.
On a plan: electrical inspection.

Dispatch

Preventive
Likely value: £240 · from price on the job
Scheduling goal: Balanced
Booked for 180 min. Tom usually takes 170 min (28 past jobs)
Parts it usually needs
Kind of work

Exact location

No pin yet. It comes from the postcode once the map is opened. The engineer sees these on the phone.

Follow-on jobs

Sample: not saved

Days and crew

Also on it (the engineer booked above leads):
Sample: not saved. It shows on the schedule in each person's row, every day it runs.

Details

When
17 Nov, 10:00 (3h)
Engineer
THTom Hughes · Van 3
Value
£240

Customer

Name
Kingsway Dental
Phone
0161 496 0295
Owes
£312

Site

Address
220 Kingsway, Burnage, M19 2LP
Access
Park at the rear

Equipment

Item
Hager 18-way RCBO board
Type
Consumer unit
Installed
2016
Next due
Due in 125 days
Last certificate
EICR-1102