Jobs
New job
Jobs / #4870

EICR, 3-phase board

#4870 · Electrical inspection (EICR) · Whitworth Mill Offices · came in by email on 14 Nov at 09:00

On site
Pass to another firm
✓Logged✓Booked✓On the way4On site5Job done6Invoiced

Faults found · 2

Repair quote →
C2
Board DB2, 2nd floorNo RCD on 6 office socket circuits. Fix: Fit RCBOs to circuits 1 to 6.
Found today£420
C3
Main boardNo surge protection. Fix: Fit surge protection to the main board.
Found today£310

Change who or when

Checklist · Electrical inspection

3 of 6 done
Arrived
tick
Safe isolation done
tick
Photo of the consumer unit
photo
Circuits tested
numberRequired
Faults logged (C1, C2, C3, FI)Each one goes on the repair quote with its photo
text
Customer signature
signatureRequired

Risk assessment · Electrical work

Must be signed before starting
6 hazards to check. The engineer fills it in and signs on the phone before they can start.

Electrical installation condition report

Filled in on site

Forms

Site safety checkNot filled in
Customer handoverNot filled in
Thermal imaging surveyNot filled in

Tasks

0 to do

Chat

Only your team sees this
No messages yet. The engineer on this job sees them on their phone.

Handover notes

For whoever goes next

Job report and invoice line

Draft, to approve
Written by AI from this job's records. Read it, change anything, then approve.

Everything that's happened

Arrived, signed in at the loading baySam Okafor · 17 Nov 09:04

Live profit

£510 · 75%
Price
£680
Parts and materials
£0
Labour
£170

Extra work

Engineers can agree up to £150 on site
None logged. Engineers add it from the phone; you can add it here.
Log extra work or a daywork

Project and subcontractor

Summary

Job #4870: Electrical inspection (EICR), EICR, 3-phase board. Status On site. Priority normal. For Whitworth Mill Offices at Whitworth Street, City Centre, M1 3HB. Sam Okafor is on it. Booked 17 Nov. Checklist 3 of 6 done. Faults found: C2 Board DB2, 2nd floor (found), C3 Main board (found).Example business: from the sample records.

Worth mentioning

What the engineer sees
Consumer unit is due again in 45 daysOffer to book the next one now, so they don't have to ring.

Did it make money? (so far)

£510 · 75%
Billed
£680
Labour
£119 · 3h 30m of 5h booked
Travel
£14 · 18 min
Parts
£37

Before you go

What the engineer sees
Whitworth Mill: 14-year-old Schneider.
Last visit 16 Nov: tripping circuit, 2nd floor, Sam.
Schneider 3-phase distribution board, fitted 2012 (14 years old). Last inspected 59 months ago.
Older than most. If it's costing them in repairs, offer a replacement quote. There's a button on the job.
Access: Loading bay, buzz facilities.
They owe £2,210. Don't bring it up, the office is chasing it.

Dispatch

Preventive
Likely value: £680 · from price on the job
Scheduling goal: Balanced
Booked for 300 min. Sam usually takes 160 min (26 past jobs)
Parts it usually needs
Kind of work

Exact location

Open the map pin
Pin from the postcode. Paste the exact spot from a map to move it. The engineer sees these on the phone.

Follow-on jobs

Sample: not saved

Days and crew

Also on it (the engineer booked above leads):
Sample: not saved. It shows on the schedule in each person's row, every day it runs.

Details

When
17 Nov, 09:00 (5h)
Engineer
SOSam Okafor · Van 5
Value
£680

Customer

Name
Whitworth Mill Offices
Phone
0161 496 0386
Owes
£2,210

Site

Address
Whitworth Street, City Centre, M1 3HB
Access
Loading bay, buzz facilities

Equipment

Item
Schneider 3-phase distribution board
Type
Consumer unit
Installed
2012
Next due
Due in 45 days
Last certificate
EICR-0981