Jobs
Jobs / #4870
EICR, 3-phase board
#4870 · Electrical inspection (EICR) · Whitworth Mill Offices · came in by email on 14 Nov at 09:00
On sitePass to another firm
✓Logged✓Booked✓On the way4On site5Job done6Invoiced
Faults found · 2
Repair quote →C2
Board DB2, 2nd floorNo RCD on 6 office socket circuits. Fix: Fit RCBOs to circuits 1 to 6.
Found today£420C3
Main boardNo surge protection. Fix: Fit surge protection to the main board.
Found today£310Change who or when
Checklist · Electrical inspection
3 of 6 doneArrived
tickSafe isolation done
tickPhoto of the consumer unit
photoCircuits tested
numberRequiredFaults logged (C1, C2, C3, FI)Each one goes on the repair quote with its photo
textCustomer signature
signatureRequiredRisk assessment · Electrical work
Must be signed before starting6 hazards to check. The engineer fills it in and signs on the phone before they can start.
Electrical installation condition report
Filled in on siteThe engineer fills this in on their phone. It's sent to the customer as soon as the job is closed. The next one is due 60 months later, from the date on the certificate.
Another certificate for this job
PAT test certificate and registerMinor electrical installation works certificateElectrical installation certificateElectrical danger notificationEmergency lighting inspection and test certificate (BS 5266-1)Fire alarm inspection and servicing certificate (BS 5839-1)Fire alarm installation and commissioning certificate (BS 5839-1)Fire extinguisher service certificate (BS 5306-3)EV charger installation certificate
Forms
Site safety checkNot filled in
Customer handoverNot filled in
Thermal imaging surveyNot filled in
Tasks
0 to doChat
Only your team sees thisNo messages yet. The engineer on this job sees them on their phone.
Handover notes
For whoever goes nextJob report and invoice line
Draft, to approveEverything that's happened
Arrived, signed in at the loading baySam Okafor · 17 Nov 09:04
Live profit
£510 · 75%- Price
- £680
- Parts and materials
- £0
- Labour
- £170
Extra work
Engineers can agree up to £150 on siteNone logged. Engineers add it from the phone; you can add it here.
Log extra work or a daywork
Project and subcontractor
Summary
Job #4870: Electrical inspection (EICR), EICR, 3-phase board. Status On site. Priority normal. For Whitworth Mill Offices at Whitworth Street, City Centre, M1 3HB. Sam Okafor is on it. Booked 17 Nov. Checklist 3 of 6 done. Faults found: C2 Board DB2, 2nd floor (found), C3 Main board (found).Example business: from the sample records.
Worth mentioning
What the engineer seesConsumer unit is due again in 45 daysOffer to book the next one now, so they don't have to ring.
Did it make money? (so far)
£510 · 75%- Billed
- £680
- Labour
- £119 · 3h 30m of 5h booked
- Travel
- £14 · 18 min
- Parts
- £37
Before you go
What the engineer seesWhitworth Mill: 14-year-old Schneider.
Last visit 16 Nov: tripping circuit, 2nd floor, Sam.
Schneider 3-phase distribution board, fitted 2012 (14 years old). Last inspected 59 months ago.
Older than most. If it's costing them in repairs, offer a replacement quote. There's a button on the job.
Access: Loading bay, buzz facilities.
They owe £2,210. Don't bring it up, the office is chasing it.
Dispatch
PreventiveLikely value: £680 · from price on the job
Scheduling goal: Balanced
Booked for 300 min. Sam usually takes 160 min (26 past jobs)
Exact location
Open the map pinFollow-on jobs
Days and crew
Details
- When
- 17 Nov, 09:00 (5h)
- Engineer
- SOSam Okafor · Van 5
- Value
- £680
Customer
- Name
- Whitworth Mill Offices
- Phone
- 0161 496 0386
- Owes
- £2,210
Site
- Address
- Whitworth Street, City Centre, M1 3HB
- Access
- Loading bay, buzz facilities
Equipment
- Item
- Schneider 3-phase distribution board
- Type
- Consumer unit
- Installed
- 2012
- Next due
- Due in 45 days
- Last certificate
- EICR-0981