TodaySynced
Annual boiler service#4807 · Boiler service · 08:00Job done at 08:58The report and Service certificate went to Mark Taylor. The office has the invoice to approve.
Where
Mark Taylor 18 Beech Avenue, Sale, M33 2QTEquipment: Worcester Bosch Greenstar 4000Risk assessment · Gas work
Tap whether each one is here today. The controls are what you do about it.Gas escapeTightness test before and after the work. No smoking or naked flames. If you smell gas, make safe and follow the Gas Industry Unsafe Situations Procedure
Carbon monoxide from flues and appliancesCarry a CO monitor. Flue and combustion checks on every appliance you work on
Hot pipes, water and surfacesLet the system cool, drain down where needed, gloves for hot parts
Lofts, cupboards and tight spacesBoards and a light in lofts. Check the space is safe to work in before you start
Electrics on the applianceIsolate the appliance and prove dead before taking covers off
Method and PPE
- Arrive, introduce yourself and find the meter and the appliance
- Tightness test before starting
- Isolate gas and electrics to the appliance
- Carry out the work to the manufacturer's instructions and the Gas Safety Regulations
- Tightness test, flue and combustion checks after the work
- Show the customer, leave the paperwork and hand back
Boiler service checklist · 6 of 6
Working pressure (mbar)Not filled in
Customer signature
Forms for this job
Faults found · 0
Each one goes on the repair quote with its photo.Stuck?
Ask about this equipment, a fault code or the manual. Answers come from your firm's own manuals and records, with where it found them.AskJob report
Handover notes
Priya Shah 5 Nov · for every visit here
Side gate sticks, lift it as you push. The isolator is in the cupboard under the stairs, not by the board.
Tom Hughes 16 Nov
Started this yesterday and ran out of time. The parts are in the hall cupboard. It just needs finishing and testing.
Chat with the office
Ellie Burke · 08:05@Dan customer has rung, can you park on the road. The drive is being resurfaced.
Dan Reid · 08:09No problem, will do.
Leave a handover note
Extra work
You can agree up to £150 with the customer. Over that, the office approves it first.V-003: Lifted and relaid floorboards in two rooms the main contractor had screwed down. Not in the spec.£419.00 · Sent to the customer