Fire commissioningBoiler service · 18 Beech Avenue, Sale, M33 2QT
The premises and the system
Installation
Commissioning
Interfaces to other systems (BS 7273)
Variations from the design or the standard
Third-party certification
Devices commissioned · 1
Each device goes on the site's log with this result. A fail goes on the repair quote.
Result and declaration
I/We certify that the fire detection and fire alarm system described above has been installed and commissioned in line with the design and with BS 5839-1, apart from the variations listed above, and that it has been tested and is in working order.
Check before it goes
Looks for blank boxes and readings that don't look right. Fix them, or tap It's right.