JobsContracts
New job

Maintenance schedules

What gets done on each type of equipment, and how often. The 52-week planner builds every visit from these.

These are our own schedules, written in the SFG20 style (monthly, quarterly, 6-monthly, yearly tasks). SFG20 is licensed, so it isn't copied in. If you hold an SFG20 licence, put its schedule reference on each one so your paperwork matches.

Gas boiler

Agentryx library6 on record
TaskHow oftenMinutes
Visual check of the boiler, flue and pressureQuarterly15
Full service: burner, heat exchanger, flue gas analysisYearly60
Gas tightness test and safety recordYearly20
Change this schedule
Sample business: this is how it looks. Nothing is saved.

Gas appliances (rented)

Agentryx library3 on record
TaskHow oftenMinutes
Landlord gas safety check on every applianceYearly45
Test the CO alarmsYearly10
Change this schedule
Sample business: this is how it looks. Nothing is saved.

Consumer unit

Agentryx library2 on record
TaskHow oftenMinutes
Press-test every RCD and RCBOEvery 6 months15
Visual check for damage, heat and labelsYearly15
Periodic inspection and test (EICR)Every 5 years180
Change this schedule
Sample business: this is how it looks. Nothing is saved.

Distribution board

Agentryx library0 on record
TaskHow oftenMinutes
Press-test every RCD and RCBOQuarterly20
Thermal image of the board under loadYearly30
Visual check for damage, heat and labelsYearly15
Periodic inspection and test (EICR)Every 5 years240
Change this schedule
Sample business: this is how it looks. Nothing is saved.

Portable appliances (PAT register)

Agentryx library0 on record
TaskHow oftenMinutes
Test and tag every appliance on the registerYearly120
Change this schedule
Sample business: this is how it looks. Nothing is saved.

Fire alarm panel

Agentryx library2 on record
TaskHow oftenMinutes
Weekly call point test (done by the site, checked in the log book)Weekly5
Service visit: 25% of detectors and call points, batteries, panelQuarterly90
Full service: every detector and sounder, cause and effectYearly180
Change this schedule
Sample business: this is how it looks. Nothing is saved.

Emergency lighting system

Agentryx library0 on record
TaskHow oftenMinutes
Monthly flick test of every fittingMonthly20
Full 3 hour duration testYearly60
Change this schedule
Sample business: this is how it looks. Nothing is saved.

Fire extinguishers

Agentryx library0 on record
TaskHow oftenMinutes
Service fire extinguishersYearly60
Change this schedule
Sample business: this is how it looks. Nothing is saved.

EV charger

Agentryx library0 on record
TaskHow oftenMinutes
Inspect cable, RCD test and firmwareYearly40
Change this schedule
Sample business: this is how it looks. Nothing is saved.

System

Agentryx library0 on record
TaskHow oftenMinutes
Service systemYearly60
Change this schedule
Sample business: this is how it looks. Nothing is saved.

Part or component

Agentryx library0 on record
TaskHow oftenMinutes
Service part or componentEvery 5 years60
Change this schedule
Sample business: this is how it looks. Nothing is saved.

Heat pump

Agentryx library1 on record
TaskHow oftenMinutes
Check filters, strainer and glycolEvery 6 months30
Full service and refrigerant leak checkYearly90
Change this schedule
Sample business: this is how it looks. Nothing is saved.

Air conditioning or refrigeration

Agentryx library0 on record
TaskHow oftenMinutes
Service air conditioning or refrigerationYearly60
Change this schedule
Sample business: this is how it looks. Nothing is saved.